“Perhitungan Volume Stockpile Dan Pengoptimalan Waktu Pengolahan Stockpile 3, 5 Dan 6 Terhadap Produksi Alat Gali Muat Dan Alat Angkut Pada TB Primer Batubesi PT Timah Tbk: Calculation of Volume Stockpile and Optimization of Stockpile Processing Time 3, 5 and 6 Against the Production of Digging and Loading Equipment and Transport Equipment in Primary TB Batubesi PT Timah Tbk”. MINERAL 8, no. 2 (May 20, 2024): 31–37. Accessed April 19, 2026. https://www.journal.ubb.ac.id/index.php/mineral/article/view/5070.