[1]
“Perhitungan Volume Stockpile dan Pengoptimalan Waktu Pengolahan Stockpile 3, 5 dan 6 Terhadap Produksi Alat Gali muat dan Alat Angkut pada TB Primer Batubesi PT Timah Tbk: Calculation of Volume Stockpile and Optimization of Stockpile Processing Time 3, 5 and 6 Against the Production of Digging and Loading Equipment and Transport Equipment in Primary TB Batubesi PT Timah Tbk”, mineral, vol. 8, no. 2, pp. 31–37, May 2024, doi: 10.33019/mineral.v8i2.5070.