Perhitungan Volume Stockpile dan Pengoptimalan Waktu Pengolahan Stockpile 3, 5 dan 6 Terhadap Produksi Alat Gali muat dan Alat Angkut pada TB Primer Batubesi PT Timah Tbk: Calculation of Volume Stockpile and Optimization of Stockpile Processing Time 3, 5 and 6 Against the Production of Digging and Loading Equipment and Transport Equipment in Primary TB Batubesi PT Timah Tbk. MINERAL, [S. l.], v. 8, n. 2, p. 31–37, 2024. DOI: 10.33019/mineral.v8i2.5070. Disponível em: https://www.journal.ubb.ac.id/index.php/mineral/article/view/5070. Acesso em: 17 apr. 2026.